ROSEMEAD Boulevard SAFETY ENHANCEMENT AND BEAUTIFICATION PROJECT
POSTED: JANUARY 27, 2012

The proposed project is a safety enhancement and beautification project ot establish consistency along the entire length of Rosemead Boulevard (2 miles) from Callita Street (north) to Pentland Avenue / railroad tracks (south) in Temple City, California. Planned improvements call for new sidewalks, street amenities, landscaped medians, public art displays, protected bike lanes, traffic calming measures, and critical road and drainage enhancements.

Have questions or comments?  Email us or call (626) 285-2171.

NOTE:  Questions received on the project will be answered as part of a website weekly chat. The 'e-dialogue' will resume in late November or early December.

 

ENVIRONMENTAL DOCUMENTS AVAILABLE FOR PUBLIC REVIEW

 
 

Initial Study of Environmental Impacts
Initial Study and Mitigated Negative Declaration (in PDF format)

 


The Planning Commission will hear the item on February 28, 2011 and the City Council will hear the item on March 6, 2011. The Public Review period is from January 30 through February 29.
News Release

Notice of Intent Mailer (sent to owner's within 500 feet of Rosemead Blvd)
Initial Study and Mitigated Negative Declaration

Notice of Completion

 

PRESENTATION MATERIALS

 
 

Presentation
See what was presented October 6.

 

Video                               
Presentation Slides

 

DESIGN CONCEPTS AND DRAWINGS

 
 

Project Vision
Defines City goals for the project.

 

This project will focus on aesthetics, safety, and pedestrian and business friendly amenities.  It will also make a statement about the new 'high performance' Temple City, and jump start revitalization along the city's commercial corridors. 

 
 

Design Elements
Identifies components to achieve project vision (in PDF format).

 

Sidewalks                                
Bike Lanes
Seating    
Public Art                                  Hardscape

Lighting
Bus Stops
Signage                                  Plantings
Identity

 
 

Design Concepts
Assembles design elements for illustration purposes (in JPEG format).

 

Callita Gateway
Las Tunas Gateway
Railroad Bridge Gateway

Gateway Development Integration   
Mid-Block Perspective
Protected Bike Lanes      

 
 

Design Layout
Lays out site specific improvements by approximate address (in PDF format).

 

4914-5132 Rosemead Blvd.
5200-5333 Rosemead Blvd.
5522-5570 Rosemead Blvd.

5770-6038 Rosemead Blvd.
6102-6328 Rosemead Blvd.
6343-6639 Rosemead Blvd.

     
 

Technical Drawings
 Prepares the design for construction; drawings are 60% complete (in PDF format).

 

Index, Notes, Abbreviations
Existing Conditions
Demolition
Hardscape
Site Control
Pavement and Grading
Utilities

Misc. Details
Irrigation and Planting
Enlargements and Details
Environmental Graphics
Signing and Striping
Street Lighting
Traffic Signals