ROSEMEAD Boulevard SAFETY ENHANCEMENT
AND BEAUTIFICATION PROJECT
POSTED: JANUARY 27, 2012
The proposed project is a safety enhancement and
beautification project ot establish consistency along
the entire length of Rosemead Boulevard (2 miles) from
Callita Street (north) to Pentland Avenue / railroad
tracks (south) in Temple City, California. Planned
improvements call for new sidewalks, street amenities,
landscaped medians, public art displays, protected bike
lanes, traffic calming measures, and critical road and
drainage enhancements.
Have questions or comments?
Email us or call (626)
285-2171.
NOTE: Questions received on the project
will be answered as part of a website
weekly chat. The
'e-dialogue' will resume in late November or early
December. |
|
|
|
ENVIRONMENTAL DOCUMENTS AVAILABLE FOR
PUBLIC REVIEW |
|
|
 |
|
Initial Study of
Environmental Impacts
Initial Study and Mitigated Negative Declaration (in PDF
format) |
|
|
The Planning Commission will hear the item on February
28, 2011 and the City Council will hear the item on
March 6, 2011. The Public Review period is from January
30 through February 29.
News Release
Notice of Intent Mailer
(sent to owner's within 500 feet of Rosemead Blvd)
Initial Study and Mitigated
Negative Declaration
Notice of Completion
|
|
|
|
PRESENTATION MATERIALS |
|
|
 |
|
Presentation
See
what was presented October 6. |
|
|
Video
Presentation Slides |
|
|
|
DESIGN CONCEPTS AND DRAWINGS |
|
|
 |
|
Project Vision
Defines City goals for the project. |
|
|
This
project will focus on aesthetics, safety, and pedestrian
and business friendly amenities. It will also
make a statement about the new 'high performance' Temple City, and jump start revitalization along the
city's commercial corridors. |
|
|
 |
|
Design Elements
Identifies components to achieve project vision
(in PDF format). |
|
|
Sidewalks
Bike Lanes
Seating
Public Art
Hardscape |
Lighting
Bus Stops
Signage
Plantings
Identity |
|
|
 |
|
Design Concepts
Assembles
design elements for illustration purposes (in JPEG
format). |
|
|
Callita Gateway
Las Tunas Gateway
Railroad Bridge Gateway |
Gateway Development Integration
Mid-Block Perspective
Protected
Bike Lanes
|
|
|
 |
|
Design Layout
Lays out site specific improvements by approximate
address (in PDF format). |
|
|
4914-5132 Rosemead Blvd.
5200-5333 Rosemead Blvd.
5522-5570 Rosemead Blvd.
|
5770-6038 Rosemead Blvd.
6102-6328 Rosemead Blvd.
6343-6639 Rosemead Blvd.
|
|
|
|
|
 |
|
Technical Drawings
Prepares the design for construction; drawings are
60% complete (in PDF format). |
|
|
Index, Notes,
Abbreviations
Existing Conditions
Demolition
Hardscape
Site Control
Pavement and Grading
Utilities |
Misc. Details
Irrigation and Planting
Enlargements and Details
Environmental Graphics
Signing and Striping
Street Lighting
Traffic Signals |